The central government has given its approval for the implementation of Revamped Distribution Sector Scheme (RDSS) in the Union Territory of Ladakh with a sanctioned cost of Rs 687.05 crore, officials said in a PTI report.
Ladakh: Centre Sanctions Rs 687 Crores For Better Distribution Of Power
The Ministry of Power has approved the implementation of Revamped Distribution Sector Scheme (RDSS) in the Union Territory of Ladakh with a sanctioned fund of Rs 687.05 crores.
It is said that the?Ministry of Power conveyed its approval to RDSS for implementation in Ladakh.
In this regard, an agreement was signed between the chief engineer, Distribution, Ladakh Power Development Department (LPDD), Tsewang Paljor and executive director WAPCOS Limited A K Gahlot in the presence of administrative Secretary Power, Ladakh, Ravinder Kumar, they added.
The scheme includes the grid connectivity of the Changthang region, downline infrastructure in the Zanskar region along with other loss reduction works in the Leh and Kargil districts of Ladakh, they said.
The Ministry of Power also approved the appointment of WAPCOS, a Government of India undertaking as the project management agency (PMA) for the implementation of RDSS in Ladakh.
The Revamped Distribution Sector Scheme aims to improve operational efficiencies and financial sustainability, by providing result-linked financial assistance to DISCOMs for strengthening supply infrastructure based on meeting pre-qualifying criteria and achieving basic minimum benchmarks.
?
- Previous StoryMarital Rape 'A Social Issue Not Legal', Centre Files Affidavit With SC Against Criminalisation
- Next Story